Fix It

Professional Handyman

Portfolio

Finished work.

Bathroom remodels

Before: the old garden tub and tile
Before: the old garden tub and tile
Tear-out day
Tear-out day
Waterproofing goes on before any tile
Waterproofing goes on before any tile
Built-in shower niche, sealed up
Built-in shower niche, sealed up
New shower pan and drain
New shower pan and drain
Tile going up around the niche
Tile going up around the niche
Tile set, ready for grout
Tile set, ready for grout
Walk-in shower coming together
Walk-in shower coming together
New vanity, mirror, and floor
New vanity, mirror, and floor
After: walk-in shower and new vanity
After: walk-in shower and new vanity
After: bright, clean, and done
After: bright, clean, and done
Shower pan waterproofed and ready for tile
Shower pan waterproofed and ready for tile
Shower walls sealed before tile
Shower walls sealed before tile
Pulling out an old tub
Pulling out an old tub
Backer board up for the new surround
Backer board up for the new surround
New vanity top
New vanity top
Before: measuring the old jetted tub
Before: measuring the old jetted tub
Before: the old bathroom
Before: the old bathroom
Tear-out day: old floor tile coming up
Tear-out day: old floor tile coming up
Old tub surround stripped down
Old tub surround stripped down
Vanity wall opened up for new plumbing
Vanity wall opened up for new plumbing
Old tub out, plumbing exposed
Old tub out, plumbing exposed
Shower pan and waterproofing in progress
Shower pan and waterproofing in progress
Waterproofed shower, ready for board
Waterproofed shower, ready for board
Corner shower framed and waterproofed
Corner shower framed and waterproofed
Walls boarded and taped
Walls boarded and taped
Shower boarded with a built-in niche
Shower boarded with a built-in niche
Shower walls boarded and sealed
Shower walls boarded and sealed
New shower pan set
New shower pan set
Shower niche framed in
Shower niche framed in
Built-in shower bench taking shape
Built-in shower bench taking shape
Shower drain set and sealed
Shower drain set and sealed
Waterproofed shower, ready for tile
Waterproofed shower, ready for tile
Shower waterproofed, floor tile in
Shower waterproofed, floor tile in
Hex tile shower floor done
Hex tile shower floor done
Hex tile floor in the new shower
Hex tile floor in the new shower
Shower bench and niche, ready for wall tile
Shower bench and niche, ready for wall tile
Large-format tile going up
Large-format tile going up
Leveling clips keep every tile flat
Leveling clips keep every tile flat
Wall tile set around the room
Wall tile set around the room
Tiled niche in the new shower
Tiled niche in the new shower
Tile done, ready for glass
Tile done, ready for glass
Before: the old double vanity and mirror
Before: the old double vanity and mirror
After: double vanity, tiled shower, and new floor
After: double vanity, tiled shower, and new floor
Finished tile shower with hex floor
Finished tile shower with hex floor

Flooring

Before: flooring pulled up
Before: flooring pulled up
LVP going down
LVP going down
Long runs of new LVP
Long runs of new LVP
New floor right up to the new shower
New floor right up to the new shower
One floor through the whole house
One floor through the whole house
Clean lines from room to room
Clean lines from room to room
Before: old floor up, subfloor showing
Before: old floor up, subfloor showing
Before: bare floor, ready for prep
Before: bare floor, ready for prep
New LVP down the hall
New LVP down the hall
Tight edges along the baseboards
Tight edges along the baseboards
After: new floor, fresh room
After: new floor, fresh room
New floors, wall to wall
New floors, wall to wall
New flooring and base for a commercial space
New flooring and base for a commercial space
Before: worn-out carpet
Before: worn-out carpet
Before: carpet out, floor prepped
Before: carpet out, floor prepped
Before: old floor up, ready for new
Before: old floor up, ready for new
Old tile up, scraping the floor clean
Old tile up, scraping the floor clean
Bare floor, ready for prep
Bare floor, ready for prep
Floor patched and leveled
Floor patched and leveled
Self-leveler going down in the bathroom
Self-leveler going down in the bathroom
Rotted subfloor replaced with new plywood
Rotted subfloor replaced with new plywood
Laying new plank flooring
Laying new plank flooring
New plank flooring down the hallway
New plank flooring down the hallway
Bedroom finished with new plank flooring
Bedroom finished with new plank flooring

Kitchens

Before: old tile counters and oak cabinets
Before: old tile counters and oak cabinets
New cabinets, counters, and floor going in
New cabinets, counters, and floor going in
Cabinets set, flooring down
Cabinets set, flooring down
Before: kitchen wall stripped and ready
Before: kitchen wall stripped and ready
New shaker cabinets going up
New shaker cabinets going up
Pantry cabinets and uppers in
Pantry cabinets and uppers in
New counters on new cabinets
New counters on new cabinets
Flooring going in around the new kitchen
Flooring going in around the new kitchen
Before: the old kitchen
Before: the old kitchen
Kitchen cleared out and floor prepped
Kitchen cleared out and floor prepped
New base cabinets going in
New base cabinets going in
New upper cabinets hung
New upper cabinets hung
Cabinets in and protected during the remodel
Cabinets in and protected during the remodel
New quartz counters set
New quartz counters set
Clean corner seam on the new counters
Clean corner seam on the new counters
New faucet and sink installed
New faucet and sink installed
Before: tiled peninsula and dated kitchen
Before: tiled peninsula and dated kitchen

Framing and builds

Mountain cabin, framing in the snow
Mountain cabin, framing in the snow
Steel frame going up
Steel frame going up
Walls framed with a view
Walls framed with a view
Framing the lower level
Framing the lower level
Footings and pier forms set at the cabin site
Footings and pier forms set at the cabin site
Foundation walls in, digging out the snow
Foundation walls in, digging out the snow
Foundation walls poured and backfilled
Foundation walls poured and backfilled
Foundation walls up and wrapped for winter
Foundation walls up and wrapped for winter
Wall framing starting on the lower level
Wall framing starting on the lower level
Posts and framing going in on the slab
Posts and framing going in on the slab
Support posts set inside the foundation
Support posts set inside the foundation
Rebar grid set and ready for the slab pour
Rebar grid set and ready for the slab pour
Concrete columns going up
Concrete columns going up
Columns set and lumber staged
Columns set and lumber staged
Slab poured, lumber on site
Slab poured, lumber on site
Framing a new interior wall
Framing a new interior wall

Fences and gates

Before: the old fence and gate
Before: the old fence and gate